NVIDIA / Ampere / Datacenter

NVIDIA A100 80GB
LLM fit guide.

Mature datacenter. This profile uses an 85% planning ceiling, leaving approximately 12.0 GB outside the recommended workload envelope.

VRAM80GB advertised
Planning ceiling68.0 GB
Models within ceiling15 of 15
ArchitectureAmpere
Realtime price index$0.89 / GPU-hour
Price evidence77 current samples · market+reference

Observed range $0.64–$0.88 per GPU-hour. Updated Nov 26, 2026, 3:00 PM. Price is an index, not a Flatkey quote or availability promise.

Open methodology and live index ↗
Model fit matrix

What fits in 80 GB?

These estimates use one 8K sequence and include runtime workspace. “Multi-GPU” indicates the minimum memory-equivalent device count, not a guarantee that the model or runtime supports that topology efficiently.

01 / Good fit

Where this profile makes sense.

NVIDIA A100 80GB is positioned as mature datacenter hardware with 80 GB of memory. It is a practical candidate when the full serving envelope stays below 68.0 GB per device and the runtime supports the selected precision. For latency or throughput planning, memory fit is only the first gate: benchmark the exact model, batch shape, framework, and provider topology.

02 / Watch-outs

Why a fit can still fail.

Advertised capacity is not always fully available to model serving. Drivers, runtime kernels, CUDA or ROCm graphs, fragmentation, adapters, multimodal encoders, speculative decoding, and provider reservations can all move the real boundary. Treat the matrix as a shortlist, then validate on the target stack.

Validate before renting

Turn the profile into a workload test.

The displayed rate is a market index or labeled reference—not a binding offer. Recheck live availability, region, context, precision, concurrency, and GPU count before committing capacity.

Run the workload fit check →Compare all GPUs